Phase 3a
Between November 2021 and July 2022, we and Hounslow Highways delivered a programme of construction works, designed to update and improve the initial C9 scheme.
These changes, which were made between Goldhawk Road and Chiswick Lane have included:
- Reinstatement of the left-turn filter lane at the junction of Chiswick Lane and Chiswick High Road to improve traffic flow and bus journey times
- Introduction of eastbound and westbound bus lanes between Homefield Road and Netheravon Road to improve bus journey times
- Installation shelters at bus stops between Chiswick Lane and Heathfield Terrace
- Introduce more pick-up and drop-off points for taxis and other vehicles between Chiswick Lane and Heathfield Terrace
- Replacement temporary traffic wands with permanent, paved barriers, to make road segregation clearer
- Changes to side road layouts to make cyclists more visible to vehicles
- Installation of more signs and road markings to make the cycle lanes more visible
- Additional tactile paving and new paving including pavement levelling
- Introduction raised tables at side roads.